DAVID PRESTON

  • Home
  • Online CV
  • Companies
    • National Grid 1991
    • Westinghouse Signals Ltd
    • Parsons Brinckerhoff Infrastructure Ltd
    • Alstom Transport Information Solutions
    • Alcatel Transport Automation Solutions
    • UK Power Networks
    • National Grid 2010 >
      • Rollover Price Review 2010 Submission to OFGEM
      • Offshore Development Information Statement (ODIS) Document Review
      • System Strategy Electricity Network Investment Meetings
      • Boundary Sensitivity Studies
      • High Voltage Direct Current (HVDC) System Studies
      • DigSilent Power Factory Training
      • RIIO Project System Studies
      • Seven Year Statement (SYS) System Studies
    • Phoenix Social Enterprise
    • Setec
  • Capabilities
  • Projects
  • Voluntary Experience
    • Badminton >
      • Activ Badminton CIO
      • Aero Badminton Club
      • Calne Badminton Club
      • Chippenham Badminton Club
      • Malmesbury Badminton Club
    • Mental Health >
      • Bristol Asperger Social Club CIO
      • National Autistics Society Bristol
    • Social Clubs >
      • Swindon Social Group
      • Wiltshire Social Group
    • Swindon Panel Society
    • Walking >
      • Chippenham Mountaineering Club
      • Wiltshire Wanderers
      • Wiltshire Hill Walkers
  • Contact
  • Home
  • Online CV
  • Companies
    • National Grid 1991
    • Westinghouse Signals Ltd
    • Parsons Brinckerhoff Infrastructure Ltd
    • Alstom Transport Information Solutions
    • Alcatel Transport Automation Solutions
    • UK Power Networks
    • National Grid 2010 >
      • Rollover Price Review 2010 Submission to OFGEM
      • Offshore Development Information Statement (ODIS) Document Review
      • System Strategy Electricity Network Investment Meetings
      • Boundary Sensitivity Studies
      • High Voltage Direct Current (HVDC) System Studies
      • DigSilent Power Factory Training
      • RIIO Project System Studies
      • Seven Year Statement (SYS) System Studies
    • Phoenix Social Enterprise
    • Setec
  • Capabilities
  • Projects
  • Voluntary Experience
    • Badminton >
      • Activ Badminton CIO
      • Aero Badminton Club
      • Calne Badminton Club
      • Chippenham Badminton Club
      • Malmesbury Badminton Club
    • Mental Health >
      • Bristol Asperger Social Club CIO
      • National Autistics Society Bristol
    • Social Clubs >
      • Swindon Social Group
      • Wiltshire Social Group
    • Swindon Panel Society
    • Walking >
      • Chippenham Mountaineering Club
      • Wiltshire Wanderers
      • Wiltshire Hill Walkers
  • Contact

Seven Year Statement (SYS) System Studies

​Performed AC, DC thermal load flow and fault level studies using DigSilent Power Factory to model for the first time with this software suite the full GB system for the 2011 Seven Year Statement (SYS) submission. 
 
This included reporting on zonal system transfers, interconnectors, installed generation, demand, new generation and generation closures up to and including the period 2020.  Examined likely system reinforcement options as well as the accompanying narratives to be written to be included in the SYS.
 
Developed setup files for boundary zonal system transfers, including system topology and system outages.
 
Created and executed AC and DC thermal load flow studies using generation background data to 2011, 2013 and 2015 year scenarios, for boundaries B11, B12, B13, B16 and B17.
 
Created and executed AC Voltage Compensation studies using generation background data to 2011, 2013 and 2015 year scenarios, for boundaries B11, B12, B13, B16 and B17.
 
Created and executed AC Voltage Collapse and AC Voltage Compliance studies, as per SQSS, using generation background data to 2011, 2013 and 2015 year scenarios, for boundaries B11, B12, B13, B16 and B17.
 
Created and executed fault level for 1 and 3 phase studies using generation background data to 2011, 2013 and 2015 year scenarios, for boundaries B11, B12, B13, B16 and B17.  Studies were repeated to include modifications at West Burton & Cottam 400 kV Substation upgrades undertaken during 2015.

Services

Service One
Service Two
Service Three

Company

About
The Company
Menu

Support

Contact
FAQ
Terms of Use
© COPYRIGHT 2015. ALL RIGHTS RESERVED.